[I. CALL TO ORDER]

[00:00:07]

IT IS NOW SEVEN O'CLOCK.

I'LL CALL TO ORDER THE MEETING OF THE COMMISSION, THE PLANNING COMMISSION OF THE TOWN OF FRONT ROYAL MS. POTTER, COULD YOU TAKE THE ROLE PLEASE? CHAIRMAN MARNER.

PRESENT.

COMMISSIONER MARRAZZO? HERE.

COMMISSIONER NEIL? HERE.

COMMISSIONER GILLESPIE.

HE IS ABSENT THIS EVENING.

DO WE HAVE A QUORUM? YES, MA'AM.

WE HAVE A QUORUM.

OKAY.

IS THERE ANY ADDITION OR DELETION FROM THE AGENDA? HEARING NONE.

WE WILL PROCEED WITH THE AGENDA AS IT WAS PREPARED.

UH, THE MINUTES

[IV. APPROVAL OF MINUTES]

OF JUNE 26TH, THE APPROVAL OF THE MINUTES OF JUNE 26TH ARE NOW UP FOR CONSIDERATION.

UM, I WOULD LIKE TO, UH, MAKE A SUGGESTION THAT ON PAGE ONE, UH, THE SENTENCE CLOSE TO THE BOTTOM THAT SAYS, CONSIDERATION WAS POSTPONED TILL THE END OF THE MEETING, UH, BE MODIFIED.

UM, UH, BECAUSE THE, I'M SORRY, THE LANGUAGE SAYS POSTPONED UNTIL THE NEXT MEETING, BUT IN FACT IT WAS DEALT WITH AT THE END OF THE MEETING.

AND, UH, THAT SHOULD BE AMENDED TO REFLECT THAT IT WAS DEALT WITH AT THE END OF THE MEETING.

SEE PAGE SEVEN? AND THAT'S A CHANGE THAT I WOULD SUGGEST.

DO I NEED TO VOTE FOR THAT? DO I NEED TO VOTE FOR THAT? A MOTION AND A SECOND DO FOR MY CHANGE? DO WE, I MEAN, YOU CAN PUT THAT INTO THE MOTION TO CHANGE.

YEAH.

OKAY.

OKAY.

DO I HEAR A MOTION TO APPROVE MINUTES? I, YEAH.

I WOULD MOVE TO, UH, APPROVE THE MINUTES WITH THE, UH, CHANGE SUGGESTED FOR, UH, PAGE ONE.

A SECOND.

ALL IN FAVOR? AYE.

AYE.

YEAH.

OKAY.

MINUTES HAVE BEEN APPROVED.

THIS IS THE TIME FOR CITIZEN COMMENTS.

IS THERE ANY MEMBER OF THE PUBLIC WHO WOULD LIKE TO MAKE A COMMENT ON ANY MATTER PERTAINING TO PLANNING COMMISSION BUSINESS? NO.

NO ONE HAS SIGNED UP.

OKAY.

I WILL CLOSE THE PUBLIC HEARING.

NEXT ITEM

[ VI. CONSENT AGENDA]

ON THE AGENDA IS THE CONSENT AGENDA.

UM, NOW LET IT BE REMINDED THAT THIS IS NOT APPROVING ANY PLAN OR MAKING ANY APPROVAL OF THESE ITEMS. THIS IS MERELY APPROVING THE ITEMS TO BE PUT ON THE AGENDA FOR FURTHER DISCUSSION.

THE FIRST ITEM IS NUMBER TWO.

CHAIR.

COULD I JUST MAKE ONE CORRECTION? SURE.

IT'S, IT'S TO PUT, IT'S TO CONSENT TO ADVERTISE IT FOR PUBLIC HEARING IN SEPTEMBER FOR PUBLIC HEARING IN SEPTEMBER.

YEAH, RIGHT.

SORRY.

THANK YOU.

MM-HMM, .

SO ITEM NUMBER 2 4 0 0 4 3 6 REZONING APPLICATION SUBMITTED BY KAREN ALEXANDER REQUESTING AN AMENDMENT TO THE ZONING MAP TO RECLASSIFY VACANT LAND IDENTIFIED BY TAX MAP TWO OH A 12 DASH THREE DASH 27 FROM C ONE COMMUNITY BUSINESS DISTRICT R THREE RESIDENTIAL.

UM, THE OTHER ITEM IS NUMBER 2 4 0 4 8 3.

A SPECIAL USE PERMIT APPLICATION SUBMITTED BY THE SALVATION ARMY FOR AN ARTISTIC MURAL EXCEEDING 60 FEET ON THE WEST SIDE OF THE BUILDING, LOCATED AT 2 96 SOUTH STREET, IDENTIFIED BY TAX MAP 20 A EIGHT DASH 16 DASH B.

THIS IS ZONE C ONE COMMUNITY BUSINESS DISTRICT.

AND, UH, DOY HAVE A MOTION TO CONSENT TO ADVERTISE THESE ITEMS FOR PUBLIC HEARING.

AT THE SEPTEMBER 18TH MEETING, I MOVE THE P COMMISSION APPROVED.

THE AGENDA IS PRESENTED.

IS THERE A SECOND? SECOND.

ALL IN FAVOR? AYE.

AYE.

OKAY.

WE HAVE ONE

[VII. NEW BUSINESS]

ITEM OF NEW BUSINESS, AND THIS IS ITEM NUMBER 2 4 0 0 4 2 9.

A REQUEST FOR A PRELIMINARY PLAN APPROVAL FOR A MAJOR SUBDIVISION SUBMITTED BY DOUGLAS MCCARTY, DENNIS MCCARTY, AND DONALD MCCARTY FOR A SUBDIVISION CONTAINING 18 LOTS AND 33 DWELLING UNITS LOCATED AT 3 44 WEST MAIN STREET.

IDENTIFIED ON TAX MAP TWO OH A SIX, SECTION FIVE PARTIALS EIGHT EIGHT A AND EIGHT B.

THE PROPERTY IS ZONED R TWO RESIDENTIAL.

MR. WARE, WOULD YOU GIVE A PRESENTATION, PLEASE? GOOD EVENING.

UH, FOR THIS APPLICATION, THIS IS A MAJOR

[00:05:01]

SUBDIVISION PRELIMINARY PLAN, AS DISCUSSED AT THE, UH, PREVIOUS WORK SESSION THIS MONTH.

PART OF THE, UH, PRELIMINARY PLAN, UH, IS FOR THE PROPOSED LOTS PARCELS, STREETS, AND STORM DRAINAGE AND PUBLIC UTILITIES.

AS PART OF THE PRELIMINARY PLAN FOR MAJOR SUBDIVISION, UH, OUR CHAPTER 1 48 3 10, DG, THE PRELIMINARY PLAN APPROVAL DOES NOT AUTHORIZE CONSTRUCTION OF IMPROVEMENTS WITHIN THE SUBDIVISION DEVELOPMENT PLAN.

SO THIS DOES NOT AUTHORIZE CONSTRUCTION.

THE PRELIMINARY PLAN, UH, ONCE THE PRELIMINARY PLAN IS APPROVED, IT IS, IT SHALL BE VALID FOR A PERIOD OF FIVE YEARS, PROVIDED THE SUBDIVIDED SUBMITS A FINAL SUBDIVISION PLAT WITHIN ONE YEAR.

SO, UH, WITH ANY MAJOR SUBDIVISION ON A PRELIMINARY PLAN, ONCE THAT IS APPROVED, THEY HAVE FIVE YEARS.

UH, IT'LL REMAIN VALID FOR FIVE YEARS.

IF THEY SUBMIT THE, UH, FINAL SUBDIVISION PLA WITHIN A 12, UH, 12 MONTH OR ONE YEAR PERIOD, IT SHOULD BE NOTED.

WE GET THESE, UH, AFTER ONE CHAPTER 1 48 3 15, THE APPLICANT SHALL NOT HAVE MORE THAN 36 MONTHS AFTER RECEIVING OFFICIAL NOTIFICATION OF APPROVAL OF THE PRELIMINARY PLAN TO FILE WITH THE TOWN AND APPLICATION FOR, FOR THE MAJOR SUBDIVISION.

FAILURE TO DO SO SHALL MAKE THE PRELIMINARY PLAN NULL AND VOID.

SO THEY HAVE 12 MONTHS OR ONE YEAR TO DO THE PLAT, WHICH MAKES IT VALID FOR FIVE YEARS FROM THE SIGNING OF THE APPROVAL OF THE PRELIMINARY PLAN.

IF THEY DO NOT DO THE SUBDIVISION PLAT, THEY HAVE 36 MONTHS.

SO IF THEY DON'T MEET THOSE TIMEFRAMES, THE PRELIMINARY PLAN IS VOIDED.

UH, SO WHEN MAJOR SUBDIVISIONS FROM THE PRELIMINARY PLAN, THE NEXT STEP AFTER APPROVAL OF THE PRELIMINARY PLAN IS SUBMISSION OF THE SUBDIVISION PLAT AND THE MAJOR SUBDIVISION PLAN.

THOSE TWO PLAN APPROVAL PROCESS WILL BE, WILL BE REVIEWED BY THE PLANNING COMMISSION, THEN FORWARD TO TOWN COUNCIL.

THE, THE PRELIMINARY PLAN O DOES NOT GET FORWARD TO PLAN, UH, THE TOWN COUNCIL, ONLY THE PLAT AND THE MAJOR SUBDIVISION PLAN, NOT THE PRELIMINARY PLAN.

SO JUST WANNA MAKE THAT, UH, UH, FOR YOU TO RECOGNIZE ON THAT.

SO THIS APPROVAL PROCESS IS ONLY FOR THE PRELIMINARY PLAN.

UH, SO THIS IS A MAJOR SUBDIVISION DEVELOPMENT PLAN.

SO WITHIN THAT, WE, UH, REVIEW CHAPTER 1 75, WHICH CONTAINS LOT SIZE, LOT WIDTH, LOT DEPTH SETBACKS FOR THE FRONT, REAR, AND SIDES OF THE SUBDIVISION.

UH, AFTER OUR SUBDIVISION, CHAPTER 1 48, WE REVIEW THE STREET DESIGN IN EIGHT 20, THE UTILITIES AND SERVICES, WHICH INCLUDE SANITARY, UH, SEWER WATER SUPPLY, STORM WATER MANAGEMENT, STREET IMPROVEMENTS OUT OF 1 48, 8 50 FOR STREETLIGHTS, CURB AND GUTTER AND SIDEWALKS, AND TAKING CONSIDERATION, ENVIRONMENTAL IMPROVEMENTS OUT OF 1 48, 8 60.

SO THAT'S WHAT STAFF IS REVIEWING OF THE PRELIMINARY PLAN.

PART OF THE PROCESS IS INCLUDED IN THE PRELIMINARY PLAN IS THE ENS EROSION AND SEDIMENT CONTROL FOR THOSE DEVELOPMENT PLANS.

BUT THOSE ARE REVIEWED BY WARREN COUNTY.

UH, WE ARE NOT THE PROGRAM AUTHORITY FOR EROSION AND SEDIMENT CONTROL, BUT THEY'RE REQUIRED TO BE PART OF THE PLAN.

ALSO REQUIRED TO BE PART OF THE PLAN IS THE STORM WATER MANAGEMENT, UH, THE VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY AT THE HARRISONBURG OFFICE, VALLEY REGIONAL OFFICE FOR DEQ.

THEY WILL REVIEW THE STORMWATER MANAGEMENT.

SO YOU'LL HAVE THREE AGENCIES REVIEWING THESE PLANS FOR THE MAJOR PLANS.

TOWN STAFF WILL DO OUR PART FOR ZONING, UH, PUBLIC WORKS AND ENERGY SERVICES ON THE TOWN'S BEHALF.

EROSION AND SEDIMENT CONTROL WILL BE HANDLED BY WARREN COUNTY AND STORM WATER MANAGEMENT WILL BE REVIEWED BY DEQ.

SO THOSE, BUT THOSE ARE INCLUDED IN THE PACKET.

UH, ON THE PRELIMINARY PLAN, WE DID RECEIVE COMMENTS FROM WARREN COUNTY AND, UH, AND FROM DEQ ON THAT.

AND BASICALLY FOR A PRELIMINARY PLAN, THEY WILL NOT DO A THOROUGH

[00:10:01]

REVIEW OF THE PLANS 'CAUSE IT'S PRELIMINARY.

THEY DID GIVE APPROVAL THAT IT LOOKED LIKE THEY ARE IN COMPLIANCE, BUT THEY DO NOT DO A THOROUGH REVIEW OF THAT.

AND THAT'S BASICALLY, UH, THEY WILL WAIT UNTIL THE PLAN IS SUBMITTED OFFICIALLY FROM THE DEVELOPMENT PLAN.

UH, SO THE SITE THERE IS LOCATED AT 3 44 WEST MAIN STREET OUTLINED IN RED.

IT FRONTS THERE ON WEST MAIN STREET WITH ORCHARD STREET, BASICALLY SPLITTING THE THREE PARCELS IN TWO.

UH, IT HAS ROAD FRONTAGE ON THE OTHER TWO STREETS.

UH, SO IF YOU'RE FAMILIAR WITH THAT AREA.

SO, UH, SO PART OF THE PRELIMINARY PLAN, THIS IS, UH, DEVELOPMENT'S CALLED FOR SQUIRREL HILL DEVELOPMENT.

IT'S FOR DUPLEXES.

AND WE DID TAKE OUT SOME OF THE PACKETS THAT THE, UH, ENGINEERING FIRM SENT US.

SO, UH, A LOT OF THE IN, UH, SOME OF THE NOTES AND OTHER STUFF THAT'S DOES NOT PERTAIN FOR YOUR REVIEW.

UH, SO THERE'S THE EXISTING CONDITIONS.

THERE IS A SINGLE FAMILY HOME ON THE ONE LOT THAT WILL REMAIN, UH, SO THAT WILL STAY INTACT AND THAT WILL BECOME ITS OWN LOT IN THE FUTURE.

UH, THEY DID DO AN EROSION AND SEDIMENT CONTROL PLAN FOR PHASE ONE, WHICH IS REQUIRED.

UH, AND THEY ALSO DID ONE FOR PHASE TWO.

SO PHASE ONE IS ONCE THEY GET STARTED WITH THE LAND CLEARING.

AND THOSE WERE THE, WITH THE, UH, PHASE TWO IS ONCE THE HOMES GET BUILT, IT'LL BE CHANGED OVER TO PHASE TWO OF THE ENS PLAN.

UH, THE PRELIMINARY SUBDIVISION PLAT SHOWS THE DUPLEX LOTS THERE AND THE EXISTING SINGLE FAMILY HOME AT THE TOP OFF OF WEST MAIN STREET, THOSE LOTS WILL, UH, FRONT ON WEST MAIN STREET WITH DRIVEWAYS AND THE, UM, MAJORITY OF OTHER HOMES WILL BE OFF OF ORCHARD STREET.

AND THIS IS BY, RIGHT.

SO I WANNA EMPHASIZE THIS IS BY, RIGHT, THIS IS NOT A REZONING OR A SPECIAL USE PERMIT.

THESE ARE BY RIGHT FOR THIS TYPE OF ZONING.

UH, THEY ALSO DID A SITE DIMENSIONAL PLAN THAT WE WOULD VERIFY THE LOT SIZES THAT ARE IN CONFORMANCE WITH OUR TOWN CODE FOR THE SUBDIVISION LAYOUT FOR THESE LOTS.

UH, THEY DID A UTILITY PLAN.

UH, THE UTILITIES, THE WATER AND SEWER MAJORITY OF THOSE ARE WITHIN THE STREET ITSELF ALREADY, SO THEY'RE NOT EXTENDING, UH, JUST A LITTLE BIT OF SEWER AND WATER TO A COUPLE LOTS THERE IN THE BACK.

BUT MAJORITY OF THOSE CONNECTIONS WILL BE FROM THE STREET.

UH, SO VERY LITTLE INFRASTRUCTURE AS FAR AS THE WATER AND SEWER NEEDS TO BE EXTENDED.

UH, THEY WILL, THEY DID DO A GRADING PLAN THERE, SHOWING THE GRADES.

UH, ONCE THE CONSTRUCTION EVERYTHING'S COMPLETED ON THE PRELIMINARY PART OF IT, THERE WILL BE ONE LOT, UH, SET ASIDE FOR STORM WATER MANAGEMENT.

UH, THEY DID THE ANALYSIS ON THE STORM WATER MANAGEMENT.

THEY ANALYZED THE DRAINAGE AREAS PRIOR TO PRE-DEVELOPMENT, AND THEY DID IT OBVIOUSLY FOR POST-DEVELOPMENT.

AFTER THAT, DID THEIR CALCULATIONS.

AND AGAIN, ONCE THIS DEVELOPMENT PLAN COMES BACK TO YOU, DEQ WILL REVIEW THIS PART OF IT.

IT'S, IT'S REQUIRED TO BE PART OF THE PLAN, BUT THEY WILL DO THE REVIEW PART OF THIS.

THEY WILL CHECK ALL THE CALCULATIONS ON THAT PART OF IT TO SEE IF THEN THEY ARE IN AGREEMENT WITH WHAT WAS SUBMITTED.

UH, THERE'S A STORM WATER MANAGEMENT PLAN, HOW THEY'RE GOING TO CONTROL THE STORM WATER QUALITY AND QUANTITY ON THE SITE, UH, AND PUT IN THE POND AND THE LEVELS THAT, UH, WILL BE VERIFIED BY DEQ FOR THE RUNOFF ON THE STORM.

AND DEQ WILL GIVE THAT APPROVAL BEFORE WE DEAL WITH IT.

AGAIN, THAT, THAT'LL BE FOR THE DEVELOPMENT PLAN, NOT, IT'S NOT PART OF THE PRELIMINARY PLAN.

I JUST WANTED TO RUN YOU THROUGH THE PROCESS.

SO THE NEXT STEP FOR THEM IS IF THIS GETS APPROVED FOR THE PRELIMINARY PLAN, THEY HAVE THE TIMEFRAME TO SUBMIT THE SUBDIVISION PLAT, THE LAYOUT OF THE LOTS.

OKAY? WE HAVE A CHECKLIST WITHIN TOWN CODE THAT REQUIRE THE REQUIRE REQUIREMENTS FOR THE LOT LAYOUTS.

WE'LL CHECK THE WIDTH, THE SIZE OF THE LOTS, THE SQUARE FOOTAGES, THE SETBACKS, UH, EVERYTHING THAT'S CONTAINED ON THAT.

AND THAT WILL BECOME BACK BEFORE YOU AS THE PLANNING COMMISSION FOR APPROVAL OF THOSE LOTS.

UH, IF, WHEN THAT IS APPROVED, THAT GOES TO TOWN COUNCIL FOR APPROVAL.

BUT THESE ARE BY, RIGHT, THESE, THESE LOTS, UH, IN THE ZONING IS BY RIGHT ONCE THE SUBDIVISION PLAT IS APPROVED AND RECORDED.

THE NEXT STEP FOR THIS TYPE OF DEVELOPMENT IS THE ACTUAL DEVELOPMENT PLAN.

THAT'S THE PHASE WHERE DEQ WILL REVIEW THE STORM WATER MANAGEMENT AND WARREN COUNTY WILL REVIEW THE EROSION AND SEDIMENT CONTROL, BUT IT'S REQUIRED TO BE PART OF THIS PLAN.

THEY WILL REVIEW THAT AT THAT PROCESS.

SO IT'S A LITTLE BIT OF A LENGTHY PROCESS DOING THE REVIEW PART OF IT.

WHEN YOU GET TO THE FINAL STAGE OF THE DEVELOPMENT PLAN, THAT WILL COME BACK BEFORE THE PLANNING COMMISSION FOR A RECOMMENDATION OF APPROVAL.

[00:15:02]

THAT WILL ALSO BE FORWARD TO TOWN COUNCIL FOR FINAL APPROVAL.

SO BASICALLY, THIS PRELIMINARY PLAN IS JUST THE FIRST STEP.

BASICALLY, YOU'RE, YOU'RE WITH THIS APPROVAL, YOU'RE GIVING THEM THE GREEN LIGHT TO, UH, FURTHER THEIR ENGINEERING STUDIES REDEFINE THINGS THAT THEY NEED TO LOOK AT.

AND THEN THEY'LL DO A RESUBMISSION, BUT THE PLAT WILL COME NEXT WITHIN THAT TIMEFRAME.

IF IT DOES NOT COME WITHIN THAT TIMEFRAME THAT WE SPOKE OF, UH, BEFORE, EARLIER, THEN THIS PLAN WILL BE VOIDED AND THEY WOULD HAVE TO START BASICALLY OVER AGAIN WITH THE PROCESS, UH, THE CLIENT AND THE, UH, THE REPRESENTATIVE KNOWS THAT, UH, I'M ASSUMING THEY'RE GONNA MOVE FORWARD WHEN THIS PRELIMINARY PLAN DOES GET REVIEWED.

WE DID HAVE COMMENTS WITH THAT ON THE FIRST SUBMITTAL.

UH, THEY DID ADDRESS THOSE COMMENTS.

THE ONES THAT WE SENT, WE INCLUDED THAT IN YOUR PACKET.

UH, PUBLIC WORKS HAS NOT GOT BACK WITH US ON THAT.

THEY MAY HAVE SOME FOLLOW UP COMMENTS, I THINK NOT, BUT THEY MAY.

SO WE DID PUT A RECOMMENDATION, UH, CONTINGENCY ON THE APPROVAL, UH, FOR YOUR MOTION.

SO JUST BE AWARE OF THAT.

THEY DID ADDRESS ALL THE COMMENTS, ACKNOWLEDGE THOSE THAT WE HAD, BUT WE STILL GO BACK TO OUR OTHER DEPARTMENTS TO MAKE SURE THEY ADDRESS THOSE COMMENTS SATISFACTORILY.

UH, I KNOW IT'S A LOT TO TAKE IN FOR THIS EVENING.

UH, WE DISCUSSED THIS AT THE WORK SESSION, BUT I JUST WANNA REITERATE, THESE ARE BY RIGHT? IT'S NOT A REZONING, NOT SPECIAL USE PERMIT WHERE YOU CAN PLACE CONDITIONS ON THIS.

AND THIS IS ONLY VALID FOR FIVE YEARS.

ONCE THEY SUBMIT THE FINAL PLAT WITHIN 12 MONTHS, IF THEY DON'T SUBMIT IT WITHIN THOSE TIMEFRAMES, AGAIN, THE, UH, PRELIMINARY PLAN IS VOIDED AND THEY WOULD START AGAIN.

AND THIS DOES NOT GIVE THEM AUTHORIZATION FOR CONSTRUCTION LAND DISTURBANCE OR ANYTHING LIKE THAT.

SO JUST REITERATE TO THAT.

UH, IF YOU TALK TO PEOPLE, THIS IS JUST PART OF THE, THE ENGINEERING PART OF IT.

UH, ANY QUESTIONS FOR STAFF REGARDING THIS? NO, SIR.

NOT AT THIS POINT.

NO QUESTIONS.

UH, THE, UH, APPLICANT MAY SPEAK NOW, OR HIS REPRESENTATIVE, PLEASE COME AND IDENTIFY YOURSELF.

GOOD EVENING.

UH, AGAIN, MY NAME IS SETH RODERICK.

I'M WITH MONTEVERDI ENGINEERING AND DESIGN STUDIO, UH, SERVING AS THE CIVIL ENGINEER OF RECORD FOR THIS PROJECT, AS WELL AS REPRESENTING THE OWNERS WHO ARE OUT OF TOWN FOR THIS EVENING.

SO WITH THAT, UM, JOHN DID AN EXCELLENT JOB PRESENTING THE PROJECT.

UH, THE NUTS AND BOLTS OF IT ARE RELATIVELY SIMPLE IN THAT, YOU KNOW, WE'RE SEEKING 16 PAIRED HOMES TOTAL OF 32 NEW UNITS WHILE PRESERVING THE EXISTING, SO TOTAL OF 33 UNITS ALTOGETHER ON THE PROPERTY.

UH, WITH THE FACT THAT THE PROPERTY SITS WITH FRONTAGE ON FOUR SIDES, YOU KNOW, THERE'S A LOT OF BUILT IN INFRASTRUCTURE, SO THERE'S NOT A WHOLE LOT OF NEW INFRASTRUCTURE.

WE ARE IMPROVING THE INFRASTRUCTURE TO, UH, CODE MINIMUM STANDARDS.

SO SOME OF THE ROADS ARE BEING WIDENED OUT, UH, TO 32 FEET, OR I'M SORRY, 36 FEET MEASURED FACE OF CURB TO FACE OF CURB.

UH, SO THERE'S A LITTLE BIT OF IMPROVEMENT ON THE STREETS, UM, THERE AS WELL.

UH, SMALL EXTENSION OF SOME OF THE UTILITY MAINS, BUT, BUT IT'S, IT'S RELATIVELY UTILIZING THE INFRASTRUCTURE THAT'S ALREADY IN PLACE.

SO WITH THAT, HAPPY TO ANSWER ANY MORE DETAILED QUESTIONS.

IF THERE ARE, AS JOHN MENTIONED, THIS IS THE FIRST STEPS.

THIS IS KIND OF LIKE AN EARLY LOOK INTO THE PROJECT.

WE'RE NOT ALLOWED TO REALLY DO MUCH AFTER THIS, EXCEPT MOVE INTO THE NEXT STEP.

UH, BUT WE JUST WANNA MAKE SURE THAT EVERYBODY FEELS COMFORTABLE WITH THE REQUEST TO HAND.

HAVE ANY QUESTIONS? NO.

ALRIGHT.

THANK YOU.

NOR DO I.

THANK YOU.

OKAY.

JUST FOR THE, FOR THE BENEFIT OF THE PUBLIC, I THINK IT'S CLEAR THAT WE'RE NOT ACTUALLY APPROVING ANYTHING EXCEPT WE ARE VERIFYING THAT THE APPLICANT HAS MET THE STANDARDS OF THE TOWN CODE AND CAN PROCEED WITH FURTHER ENGINEERING AND PLANNING.

SO WITH NO QUESTIONS, IS THERE A MOTION I MOVE THAT THE PLANNING COMMISSION APPROVE THE PRELIMINARY PLAN CONDITIONED UPON THE APPLICANT ADDRESSING THE COMMENTS CONTAINED IN THE COMMENT LETTER THAT WAS PREVIOUSLY SENT.

SECOND.

ALL IN FAVOR SIGNIFY BY SAYING AYE.

AYE.

AYE.

OPPOSED? BE HERE TO OPPOSE IT.

OKAY.

THE MOTION PASSES.

THANK YOU ALL.

APPRECIATE IT.

THANK YOU.

UM, DO ANY OF THE COMMISSION MEMBERS HAVE ANY REPORTS? JUST HAPPY .

WE'RE HAPPY TO HAVE YOU.

WE WOULDN'T HAVE OUR QUORUM WITHOUT YOU.

WE'RE HAPPY TO.

DOES THE PLANNING

[X. PLANNING DIRECTOR REPORT]

DIRECTOR HAVE A REPORT? YES, THEY DO.

ALL RIGHT.

UM, FOR THE MONTH OF JULY, WE HAD 23 NEW ZONING PERMITS.

CODE ENFORCEMENT OPENED 23 NEW CASES, CLOSED OUT SIX CASES.

WE HAD FIVE LAND USE APPLICATIONS, WE HAD ONE SIGNED PERMIT AND NINE BUSINESS LICENSES WERE

[00:20:01]

ISSUED.

WE HAVE ISSUED A TOTAL OF 94 BUSINESS LICENSES FOR THE YEAR SO FAR.

UM, AND WE HAD, WE TOOK IN THREE NEW, UM, CERTIFICATE OF APPROPRIATE DIS APPLICATIONS FOR THE BOARD OF ARCHITECTURAL REVIEW AND ISSUED WHAT APPEARS TO BE FOUR SOLICITOR ITINERANT MERCHANT PERMITS.

UM, AND WE ISSUED ONE UTIL RIGHT OF WAY UTILIZATION PERMIT.

AND FOR THE MONTH OF JULY, WE HAD 196 WALK-INS TWO PLANNING AND ZONING WITH A, MAKING THAT A TOTAL OF 1,682 WALK-INS FOR THE YEAR TO OUR DEPARTMENT.

UM, WE ARE AT 26 NEW DWELLING UNITS FOR THE, UM, YEAR TO DATE.

UH, SO I THINK WE'RE TRACKING A LITTLE HIGHER THAN THAN AVERAGE WITH THOSE.

UM, AND JUST A REMINDER, THE DRAFT ZONING ORDINANCE IS IN YOUR HANDS.

I'VE RECEIVED COMMENTS FROM TWO OF YOU.

UM, PLEASE GET COMMENTS BACK TO ME SO THAT AT THE NEXT COUPLE OF WORK SESSIONS WE COULD START WORKING THROUGH, UH, COMMENTS.

BECAUSE ONCE WE HAVE ALL OF THE, UH, PLANNING COMMISSIONS COMMENTS AND WE HAVE THOSE DISCUSSIONS, WE CAN THEN START FIGURING OUT THE TIMING OF A PUBLIC HEARING TO GET PUBLIC INPUT.

AND THE DRAFT ZONING ORDINANCE IS ON OUR WEBSITE, BUT IT IS IN THE AGENDA PACKET FOR THE PREVIOUS WORK SESSION FOR, UM, I GUESS IT WOULD'VE BEEN AUGUST WORK SESSION.

THAT IS ALL I HAVE.

THE PUBLIC HAS ACCESS TO IT, SO THE PUBLIC HAS ACCESS TO LOOK AT THE .

THE PUBLIC DOES HAVE ACCESS TO IT THROUGH THE AGENDA CENTER.

SO, BUT WE HAVE THE CHANCE TO MODIFY IT BEFORE IT BECOMES, UH, ANYTHING DEFINITE SO THE PUBLIC CAN LOOK AT IT AS WE ARE LOOKING AT IT YES.

AND MAKE THEIR COMMENTS AS WE MAKE OUR COMMENTS.

YES.

SO I IDEALLY, UM, THE PUBLIC WOULD, YOU KNOW, PUT THEIR OWN COMMENTS TOGETHER AND THEN AT THE FIRST PUBLIC HEARING, I, I WOULD IMAGINE WE WOULD PROBABLY HAVE MORE THAN ONE PUBLIC HEARING ON AN ENTIRELY NEW DRAFT ZONING ORDINANCE.

THEN PLANNING COMMISSION WOULD PROBABLY CONTINUE IT AND THEN MAKE COMMENTS AND CHANGES AS AS NECESSARY.

OKAY.

THANK YOU FOR THAT EXPLANATION.

IT'S A BIG JOB.

ANYTHING FURTHER? OKAY.

DO I HEAR A MOTION TO ADJOURN? I MOVE THAT WE ADJOURN DIVISION MEETING SECOND.

ALL IN FAVOR SAY AYE.

AYE.

WE STAND ADJOURNED.